Our Home Renovation Project (Loads of pictures)

Contents

The Basement

Radon Remediation

  • Radon Reference Information
  • Track Radon Levels in Spreadsheet form
  • 2010-03-15 : Test tool by garage down to 5.3pCi/l, by water inlet 4.1 pCi/l
  • 2010-03-13 : Test tool by garage down to 5.6pCi/l, by water inlet 3.9 pCi/l
  • 2010-03-11 : Test tool by garage down to 5.6pCi/l, by water inlet 3.4 pCi/l
  • 2010-03-07 : Test tool by garage down to 7.6 pCi/l, by water inlet 3.6 pCi/l
  • 2010-03-05 : Installed 3rd fan inline with pipe, by the garage. Increased the exhaust pressure. Radon Test tool reset. New test tool installed by water intake on opposite side of house.
  • 2010-02-06 : Radon Test tool 9.7 pCi/l
  • 2010-02-01 : Radon Test tool 9.7 pCi/l
  • 2010-01-31 : Radon Test tool 9.2 pCi/l
  • 2010-01-30 : Radon Test tool 8.8 pCi/l
  • 2010-01-23 : Radon Test tool 6.8 pCi/l
  • 2010-01-20 : Radon Test tool 5.0 pCi/l
  • 2010-01-16 : Radon Test tool 23.9 pCi/l
    • measured in main lobby house
    • Tony from Radon company came out, pressure tested
    • Installed temp exctraction from clean out of perimeter drain
  • 2010-01-11 - 2010-01-13 : Radon Test tool 30.0 pCi/l
    • measured in main lobby house
    • Radon company came out today, set both fans to draw air out
    • Increased diameter of extraction pipe to 4", put in more powerful fan, now drawing .80
    • Dug out extraction areas deeper to allow more air pull
  • 2009-12-17 2:30pm - 2009/12/23 8:30am test kit : Test Numbers 31559 54798 73.3 pCi/l
    • This test was received for analysis on 12/xx/2009
    • The total exposure time was 138 hours
    • Starting on 12/17/2009 at 2:30 pm
    • Ending on 12/23/2009 at 8:30 am
  • 2009-10-04 10:28pm - 2009/10/08 9:00pm test kit : Test Numbers 311388 26456 x.x pCi/l
    • This test was received for analysis on 12/xx/2009 [1]
    • The total exposure time was 138 hours
    • Starting on 10/4/2009 at 10:28 pm
    • Ending on 10/8/2009 at 9:00 pm
  • 2009-08-06 10:00pm - 2009/08/10 7:00pm test kit : 5497159 1.9 pCi/l
    • This test was received for analysis on 08/13/2009
    • The total exposure time was 93 hours
    • Starting on 08/06/2009 at 10:00 pm
    • Ending on 08/10/2009 at 7:00 pm
      • Excessive mold started to grow in the house on all surfaces, had to reverse the flow of the fans to draw air out.
      • All contents of garage that were organic based are covered in mold and destroyed
      • Humidity levels in excess of 78%
      • Air Conditioner running 7/24 with air filter
  • 2009-05-31 01:00am - 2009/06/05 9:00am test kit : 5607249 7.1 pCi/l
    • This test was received for analysis on 06/8/2009 --estimated
      • Closed conditions were not able to be maintained
  • 2009-04-12 10:00pm - 2009/04/16 9:00am test kit : 5593456 23.5 pCi/l
    • This test was received for analysis on 04/18/2009
    • The total exposure time was 83 hours
    • Starting on 4/12/2009 at 11:00 pm
    • Ending on 04/16/2009 at 10:00 am
  • 2009-03-15 11:00pm - 2009/03/21 10:00am test kit : 5561994 14.6 pCi/l
    • This test was received for analysis on 03/23/2009
    • The total exposure time was 131 hours
    • Starting on 3/15/2009 at 11:00 pm
    • Ending on 03/21/2009 at 10:00 am
  • 2009-02-04 10:00pm - 2009/02/09 12:01am test kit : 5497161 22.5 pCi/l
    • This test was received for analysis on 02/14/2009
    • The total exposure time was 98 hours
    • Starting on 2/4/2009 at 10:00 pm
    • Ending on 2/09/2009 at 12:00 am
  • 2008-12-31 Accredited Radon came, installed 400W High powered fan in back of house, two suction points one in the corner of the garage and one at the head of the garage to pull air from the opposite side of the house. Now pulling 1.5 atmospheres. Has to return to complete the job. Got too dark and cold as plastic started to crack.
  • 2008-12-29 Radon called, will come out 12/30 for inspection. THen cancelled and rescheduled for 12/31
  • 2008-12-24 10:25 Called Radon company reported reading, will call back on Friday 26th
  • 2008-12-13 08:30pm - 2008/12/18 8:00am test kit : 5491282 28.8 pCi/l
    • This test was received for analysis on 12/22/2008
    • The total exposure time was 107 hours
    • Starting on 12/13/2008 at 9:00 pm
    • Ending on 12/18/2008 at 8:00 am
  • 2008-10-29 10:00 Radon company installed second pull point near the furnace, used a 4" pipe. Tied it into the existing PVC, added a second fan by double stacking them. The guage now reads 1.5 atmospheres. Also enlarged the exhaust pipe from 3" to 4" up the side of the house.
  • 2008-09-27 04:30pm - 10/04/2008 19:00 test kit : 5474018 33.3 pCi/l
  • 2008-08-26 Installed a larger fan, drilled hole in the basement to check for air suction. The tech is dumbfounded and does not understand why the Radon levels are so high. We are tied into the perimeter drain and have good flow. Now we wait yet another month and see what happens.
  • 2008-08-11 08:00pm - 08/16/2008 10:00am test kit : 5457063 24.2 pCi/l
    • The total exposure time was 110 hours
    • This test was received for analysis on 08/19/2008
  • 2008-06-28 12:00pm - 2008-07-05 9:00am test kit : 5277374 6.6 pCi/L
  • 2008-04-24 08:00pm - 2008-04-29 8:00am test kit : 5364805 Results 49.0 pCi/L

2009-03-08-014.jpg_t.jpg 2009-03-08-015.jpg_t.jpg

Bathroom Jack and Jill

  • Euro Marble and Tile
    • 610 272 1662 ask for Corina
    • 2908 West Germantown Pike, Norristown, PA
    • Prices
      • Level II $1,150
      • Level III $1,350
      • Level IV $1,550

Measurements

  • Countertop 22x80, with 4" backwall and 80" Sill


The Deck

  • 2008-08-23 This week tore out the support beams and dug them down 48 inches, dropped in rebar, poured cement for new footers. Re-installed the support posts and poured more concrete. Had to jack up the porch so that it was level to the ground. Need to let the cement cure for about a month then the extra supports can be removed.
    • pictures to follow

The Porch

  • 2008-09-06 Jeannie decided to put both poles in under the porch eventhough it will block the window slighly. We paid for the pole aleady and it will balance the structure out better
  • 2008-09-04 We decided to push the porh roof out another 6 inches so the support pole is more centered. The rubber roof was added today
  • 2008-08-27 took out the old poles and the roof. The poles were plastic and not very supportive. The roof was not attached to the house and water had been running down for years. Still wet afer all these weeks of no rain. Tied the porch roof to the house and installed one column. Looks quite nice.
    • 2008-12-07-013.jpg_t.jpg
    • 2008-12-07-014.jpg_t.jpg

The Foundation

The Heating and Cooling Systems

The new Air Conditioner 2009-03-08-013.jpg_t.jpg

The Landscaping

Storm Water Management

Historical Documentation based for this area

The Windows

The Chimney

  • 2008-09-04 Stucco work begins

Dining Room

This room was painted with Sherman Williams paint in 2010

  • 6129 Restrained Gold 6/08 Low Lustre, Extra White Base
BAC Colorant   02 32 64 128
B1 - Black      - 10  1  1
R2 - Maroon     -  2  1  1 
Y3 - Deep Gold  4 38  1  - 

Paint_Chips_Sherwin_Williams03.jpg

The Garage

The Kitchen

We are just beginning to plan out the kitchen because we need to order windows and install a vent for the stovetop. Since we have to re-stucco the exterior and change the windows we need to know what we are going to do with the kitchen sooner than planned

  • Estimated time of project: 6-8 weeks
    • Actual 15 weeks
  • Estimated cost: ~30K
  • Some before and after pics

2009-01-22-002.jpg_t.jpg2009-03-25-012.jpg_t.jpg2009-01-22-001.jpg_t.jpg2009-03-28-005.jpg_t.jpg2009-01-22-034.jpg_t.jpg2009-03-28-020.jpg_t.jpg2009-01-22-022.jpg_t.jpg2009-03-28-003.jpg_t.jpg2009-01-22-005.jpg_t.jpg2009-03-28-018.jpg_t.jpg

Appliances

Cooktop

cook_top_JGCP636ADP.jpg

Jenn-Air(r) 36" Gas Cooktop

Cooktop Hood

hood_JXT9036CDP.jpg

Jenn-Air® 36" Pro-Style® Range Hood

  • Stainless Steel
  • MODEL JXT9036CDP
  • MSRP $1949.00/$1097.00

Oven and Microwave

oven_micro_KEMS308SSS.jpg

KitchenAid® 30" Built-In Microwave/Oven Combination

Dishwasher

dishwasher_JDB1255AWP.jpg

Jenn-Air® Built-In Tall Tub Steam Dishwasher

Sink Disposer

disposer_KBDS100T.jpg

KitchenAid® 1 HP In-Sink Disposer

Hot Water Dispener

hotwater_KHWC160PSS.jpg

KitchenAid® High Profile Style Hot Water Dispenser

  • Stainless Steel
  • MODEL KHWC160PSS
  • MSRP $499.00/$233.00

KHWC160PSS_Dimension_Guide.pdf KHWC160PSS_Installation_Instruction.pdf KHWC160PSS_Warranty.pdf

Fridge

fridge_KSRK25FVMK.jpg

KitchenAid® 25.4 cu. ft. 35 1/2" Width Standard-Depth Architect® Series II

Not Purchased

KitchenAid® Undermount Sink

  • MODEL KSW10C0TLL
  • MSRP $929.00/$412.00

Counter Tops

  • Euro Marble and Tile
    • 610 272 1662 ask for Corina
    • 2908 West Germantown Pike, Norristown, PA
    • Prices
      • Level II $1,150
      • Level III $1,350
      • Level IV $1,550
  • Estimates
    • Kitchen
      • Level II $5,200
      • Level III $6,000
      • Level Iv $6,800
      • Special $7,800
    • Bathroom
      • Level II $1,150
      • Level III $1,350
      • Level Iv $1,550

Proposed New Kitchen Layout

Various Views

  • 2008-12 Moved around the appliances, still need to work with the cabinets a little more
2008-12-13-001.jpg_t.jpg View from above 2008-12-13-002.jpg_t.jpg Looking back into the dining room
2008-12-13-003.jpg_t.jpg Looking from service entrance out to the porch 2008-12-13-004.jpg_t.jpg Looking out the windows
  • 2008-09

20080911_05.jpg

  • 2008-06

Kitchen view above.jpg

View from just outside the windows looking back into the house over the center island

  • 2008-09

20080911_06.jpg

  • 2008-06

Kitchen_view_island.jpg

View from the center island looking at the Oven and Microwave on either side of the refrigerator

  • 2008-09

20080911_04.jpg

  • 2008-06

Kitchen_view_oven.jpg

View looking from the front of the kitchen towards the sliding glass doors out to the deck

  • 2008-09

20080911_01.jpg

  • 2008-06

Kitchen_view_rear.jpg

View looking at the entire wall of the kitchen on the outside wall and into the mud room. We are moving the walls around and taking out some closets.

  • 2008-09

20080911_02.jpg

  • 2008-06

Kitchen_view_stovetop.jpg

Laundry Room

Main Hall

The Hall was painted with Sherman Williams paint 2010

  • 6127 Ivoire 5/02 Low Lustre, Extra White Base
BAC Colorant 02 32 64 128
B1 - Black      -  3  -  1
R2 - Maroon     -  -  1  - 
Y3 - Deep Gold  - 41  1  1 

Paint_Chips_Sherwin_Williams02.jpg

The Master Bedroom

The Roof

2008-06-12-020.jpg_t.jpg 2008-07-03-003.jpg_t.jpg 2008-07-27-002.jpg_t.jpg 2008-09-05-002.jpg_t.jpg 2008-09-14-004.jpg_t.jpg 2008-10-07-002.jpg_t.jpg 2008-10-18-001.jpg_t.jpg 2008-11-04-001.jpg_t.jpg 2008-11-06-001.jpg_t.jpg 2008-11-16-003.jpg_t.jpg 2008-12-07-009.jpg_t.jpg 2008-12-07-014.jpg_t.jpg 2008-12-07-013.jpg_t.jpg 2009-03-08-012.jpg_t.jpg